Currently Under Construction
Began Construction, Fall 2009

 

Project Description

The project consists of removing the traffic signals on U.S. 19 between Whitney Road and S.R. 60 and replacing them with two new interchanges at Seville Boulevard and Belleair Road.

The elimination of traffic signals in this project will create uninterrupted travel from 49th Street to Sunset Point Road in Pinellas County.

Motorists will still be able to have easy access to local businesses with the addition of frontage roads next to U.S. 19.

Additional improvements to S.R. 60 interchange include providing a thru movement along the frontage roads both north and southbound across S.R. 60.

Contractor - Hubbard Construction Company

Construction Begain - November 30, 2009

Anticipated Completion - Summer 2014

Project Length - 2.7 miles

Total Costs - $123,415,463

Consturction and Inspection Cost - $123,415,463

For more information, please contact:

Duane Aldrich
FDOT Construction Project Manager
11201 N McKinley Dr.
Tampa, FL 33612-6456
(813) 233-3823 or
1-800-226-7220

Email questions to
roadwork@dot.state.fl.us


Proposed Typical Sections (click on a picture for a closer look)

Typical Section - Elevated

Typical Section - At Grade

U.S. 19 Aerial Maps

Due to the size of this image it is best to download the image to your computer. To download the image, right mouse click on the image and choose Save Target As..., then save this PDF to your computer. If you need Adobe Acrobat Reader, click here to download for free.

Right mouse click to download.
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 9 minutes for 56k.

Right mouse click to download.
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 6 minutes for 56k.

Intersection Renderings (click on the picture for a closer look)

U.S. 19 at S.R. 60 Looking Northwest U.S. 19 at S.R. 60 Looking Northwest

This rendering is conceptual and is based on the current design; the final design may be different than what is shown.

Click here to go back to Project Map.

 
Last updated March 9, 2010.