Project Description
The project consists of removing the traffic signals on U.S. 19 between Whitney Road and S.R. 60 and replacing them with two new interchanges at Seville Boulevard and Belleair Road.
The elimination of traffic signals in this project will create uninterrupted travel from 49th Street to Sunset Point Road in Pinellas County.
Motorists will still be able to have easy access to local businesses with the addition of frontage roads next to U.S. 19.
Additional improvements to S.R. 60 interchange include providing a thru movement along the frontage roads both north and southbound across S.R. 60.
Contractor - Hubbard Construction Company
Construction Began - November 30, 2009
Anticipated Completion - Summer 2014
Project Length - 2.7 miles
Total Costs - $123,628,235
For more information, please contact:
Duane Aldrich
FDOT Construction Project Manager
11201 N McKinley Dr.
Tampa, FL 33612-6456
(813) 233-3823
Email questions to
roadwork@dot.state.fl.us
|
U.S. 19 Aerial Maps
Due to the size of this image it is best to download the image to your computer. To download the image, right mouse click on the image and choose Save Target As..., then save this PDF to your computer. If you need Adobe Acrobat Reader, click here to download for free.

Approximate download time per connection:
1 minute for T1, 1 minute for
cable/DSL, and 9 minutes for 56k.

Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 6 minutes for 56k.
Intersection Renderings (click on the picture for a closer look)
 |
 |
| U.S. 19 at Seville Boulevard Interchange |
U.S. 19 - South of Belleair Road Interchange |
 |
 |
| U.S. 19 at S.R. 60 Northwest Corner |
U.S. 19 at S.R. 60 Southwest Corner |
| For all four of the U.S. 19 and S.R. 60 images, click here. |
Corridor Video
Click on the sign to start the video. Loading time will vary depending on the speed of your internet connection.

Click here to go back to Project Map. |