Fact Sheet This project involves the improvement of US 19 (SR 55) from north of Whitney Road to south of Seville Boulevard. The proposed urban arterial roadway provides for six lanes (three in each direction) on US 19 with two-lane, one-way frontage roads on each side. A Single-Point Urban Interchange is proposed at Belleair Road. The Nursery Road, Haines-Bayshore Road, and Harn Boulevard intersections will be connected to the frontage roads. At the urban interchange, a new bridge structure along US 19 will replace the existing at-grade intersection.
Design is underway. Right-of-way acquisition is scheduled to begin in summer 2006. Construction is scheduled for 2009.
Proposed Typical Sections (click on a picture for a closer look) Aerial Rendering of Proposed Construction Due to the size of this image it is best to download the image to your computer. To download the image, right mouse click on the image and choose Save Target As..., then save this PDF to your computer. If you need Adobe Acrobat Reader, click here to download for free.
Rendering of Proposed Intersection (click on the picture for a closer look) This rendering is conceptual and is based on the current design; the final design may be different than what is shown. |
||||||||||||||||||