US 19 (SR 55) Feasibility and PD&E Studies
from Pinellas County Line to Hernando County Line
Pasco County, Florida
WPI Seg. No: 418860 1 * FAP No: S138-001-R

 

Study Description

The Florida Department of Transportation (FDOT) is conducting a Feasibility Study to evaluate the addition of continuous right-turn lanes throughout the project corridor without acquiring additional right-of-way. At the conclusion of the Feasibility Study, the FDOT will conduct a Project Development and Environment (PD&E) Study for US 19 (SR 55) from the Pinellas County Line to the Hernando County Line in Pasco County. The total length of this project is approximately 19.7 miles.

Proposed Improvements

The Feasibility Study shall recommend locations of continuous right-turn lanes while considering capacity needs, costs, and potential effects. The PD&E Study will develop, in addition to the at-grade continuous right-turn lane concept, conceptual designs, costs, and environmental effects of providing interchanges along the US 19 Study corridor. The PD&E Study will also address pedestrian needs and accommodations.

Project Schedule

Feasibility Began:   December 2005
Feasibility Conclusion:   June 2006
PD&E Began:   November 2006
Public Workshop:   Winter 2006/2007
Public Hearing:   Summer 2007
FHWA Approval:   Fall 2007

FDOT Tentative Five-Year Work Program (2005/06 - 2010/11)

Segment Design ROW Construction
Continuous Right-Turn Lane @ Various Locations 2007/08 2008/09 2010/11

For more information, please contact:

Amy Neidringhaus , PE
11201 N McKinley Dr., MS 7-600
Tampa, FL 33612-6456
(813) 975-6169 or
1-800-226-7220

amy.neidringhaus@dot.state.fl.us

Kris Carson
District Public Information Officer
1-800-226-7220 or
813-975-6000

Final Concept Maps from the Feasibility Study

Due to the size of these files it is best to download the image to your computer. To download the file, right mouse click on the title and choose Save Target As..., then save this PDF to your computer. If you need Adobe Acrobat Reader, click here to download for free.

Final Concept Maps, Sheets 1 - 5
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 12 minutes for 56k.
Final Concept Maps, Sheets 6 - 10
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 12 minutes for 56k.
Final Concept Maps, Sheets 11 - 15
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 12 minutes for 56k.
Final Concept Maps, Sheets 16 - 20
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 12 minutes for 56k.
Final Concept Maps, Sheets 21 - 25
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 12 minutes for 56k.
Final Concept Maps, Sheets 26 - 30
Approximate download time per connection: 1 minute for T1, 2 minute for cable/DSL, and 13 minutes for 56k.
Final Concept Maps, Sheets 31 - 37
Approximate download time per connection: 1 minute for T1, 2 minute for cable/DSL, and 17 minutes for 56k.

US 19 Continuous Right-Turn Lane Feasibility Study in Pasco County - Feasibility Recommendation presentation

Below you can download the presentation in Microsoft PowerPoint and Adobe Acrobat PDF formats.

Microsoft PowerPoint format
Approximate download time per connection: 2 minutes for T1, 3 minutes for cable/DSL, and 28 minutes for 56k.

Adobe Acrobat PDF format
Approximate download time per connection: 2 minutes for T1, 4 minutes for cable/DSL, and 41 minutes for 56k.

US 19 Project Newsletter 1 - April 2007

You can download the newsletter by clicking here.
Approximate download time per connection: 1 minute for T1, 1 minute for cable/DSL, and 5 minutes for 56k.

Click here to go back to County Map.